Construction of a temporary breakwater to support the construction of a temporary port designed to receive and transport the marine equipment needed to build the permanent breakwater, as part of the work to prepare the plant’s inlet and provide the necessary marine infrastructure for the cooling water system of the nuclear power plant’s turbines.