Paving and grading work on the Alexandria-Cairo Desert Road from km 30 to km 60

معلومات المشروع

Paving and grading work on the Alexandria-Cairo Desert Road from km 30 to km 60

Carrying out paving, grading, and improvement work on the Alexandria–Cairo Desert Highway, from kilometer 30 to kilometer 60, with the aim of enhancing the road’s efficiency, improving the quality of the infrastructure, and facilitating traffic flow in accordance with the highest quality and safety standards.


WhatsApp Image 2026-08-25 at 2.21.51 PM (1)


WhatsApp Image 2026-08-25 at 2.21.50 PM-1


WhatsApp Image 2026-08-25 at 2.21.50 PM (2)


WhatsApp Image 2026-08-25 at 2.21.50 PM (1)-1

 


WhatsApp Image 2026-08-25 at 2.21.40 PM


WhatsApp Image 2026-08-25 at 2.21.55 PM